Section 1 - Applicant's Information


Party Entering Into Agreement

Address

Contact Name


Section 2 - General Project Information


Project Address or Closest Street:


Section 3 - Applicant's Engineering Information


Engineer's Street Address:

Please enter a valid phone number.

Section 4 - Main Extension Requirements


Proposed water system design must meet the Water Main Extension Design Requirements and Water Main Technical Specification.

The design plans must show: water mains, water laterals, sewer mains, sewer laterals storm sewers, electric, telephone, other utilities, hydrants, lot lines, easements, right-of-ways (public/dedicated or private/non-dedicated), roadways and structures.

Browse
Browse

If a Water Company Sewer Master Plan or Comprehensive Plan exists, the proposed facilities must meet the design and planning requirement of the Master Plan.

If Yes, A determination letter from the NJDEP or a NJ licensed Engineer (signed and sealed) must be submitted with this application. Should a CAFRA Permit Be required, no installation work of sewer mains or services shall commence, until such time that the CAFRA Permit is issued.

Browse

Section 5 - Estimated Demands


Demands: Complete and submit with this application the Demand Calculator Worksheet to support anticipated domestic water and sewer demands for the site.

Browse

Section 6 - Service Requirements


Please be aware of the cross connection and backflow requirements as listed here:
Note: If basement apartments are proposed, those services are to be included in the totals below.

                     # of Domestic Services # of Irrigation Services # of Sewer Laterals # of Fireline Services # of Multi-use Services

1 inch

2 inch

4 Inch

6 Inch

8 Inch

Other


Section 7 - Fire Hydrants & Fire Flow Requirements


Fire Hydrants: Plans must show the location of all fire hydrants and identify as either Public or Private.

If none, put zero
If none, put zero

Fire Flow Requirements: Complete and submit with this application the Fire Flow Calculation Worksheet to support municipal fire flow requirements for the site. If project is only residential, refer to “Table A” on the “sign-off” page of the worksheet.

Browse

Section 8 - Easements


If no, skip to section 9

Plans should consider the limits of all necessary easements. Discussion with your New Jersey American Water Project Manager is recommended to properly locate and identify the general easement conditions.

For any area of the project in which water main is installed on private property and requires an easement, applicant is to provide a metes and bounds description(s) and corresponding survey map(s) prepared by a Licensed Surveyor describing the proposed easement(s).

Property Owners Address

Easement Site Location



Section 9 - Application Fee And Signature


All applications for main extensions will require a non-refundable application fee to be submitted along with the application.

Your NJAW project manager will contact you about how to complete this payment.

By signature below, I certify that the information provided in this application is true, accurate, and complete.

Person Completing the Application
Draw signature|Type signatureClear